1000 Sq Yard Plot(3BHK)

Super Built-Up Area:
3696.68 SQ. FT - 41.07%
Built-Up Area:
3259.98 SQ. FT - 36.23%
Carpet Area:
2128.10 SQ. FT - 23.64%
Courtyard:
505 Sq.ft open to sky courtyard



image

 

Structure

  • Framed structure: Stone framed load bearing structure resistant to wind & earthquake (Zone 2)
  • Walls: Poured earth walls for external and internal walls
  • Floor to ceiling height: 12ft - 15ft

 

Wall Finishing

  • Internal wall: Finished with lime plaster and 2 coats of weather-proof
  • External wall: The exterior faces of the building are finished with lime plaster and one coat of weather-proof with natural paints
  • Bathrooms: Stone masonry wall with three coats of weatherproof and waterproof
  • Kitchen: mud walls with three coats of weatherproof and waterproof

 

Doors

  • Main doors: 1200×2400mm
  • Good quality wooden door with weatherproofing and Anti-termite material
  • Ironmongeries like digital locks of Dorma/equivalent quality with tower bolts, door viewer, safety latch and door stopper
  • Bedroom, Bathroom & Utility doors: 900×2100mm
  • Good quality doors of Sal wood

 

Windows

  • Sal wood windows with detailed jail patterns and chajjas along with ornamentation
  • Ventilators: Simple terracotta brick ventilators with mesh protection

 

Roofing

  • Terracotta tiled roofing, Guna Vault roofing, Ferrocement roofing & Thatched roofing

 

Flooring

  • Floor finish with skirting
  • Foyer- rough cut stone flooring
  • Living area- Terrazzo
  • Dining area- Tandur stone flooring
  • Bedrooms- Tandur dark stone flooring
  • Kitchen- Kadappa stone flooring
  • Bathrooms: Oxide flooring

 

Kitchen and Dining

  • Kitchen- Platform finished with Granite slab of 600 mm wide at a height of 850 mm from the finished floor level
  • Electrical point for Chimney, Water purifier & Blenders/Mixers
  • CP fitting: Cera
  • Sink: Stone Sink

 

Railing

  • Balcony/ Ramps & Staircase: Wooden handrails

 

Plumbing & Sanitary

  • All bathrooms have polished chrome (CP) fixtures Cera
  • Wash basin with hot & cold mixer
  • Single lever diverter with spout & shower
  • Sanitary fixtures of Cera
  • Bathtub to the Master bedroom attached bathroom

 

Electrical

  • Concealed copper wiring of Finolex/Havells/Polycab/Anchor
  • Power sockets for AC in all bedrooms, living rooms & dining lobby
  • Power sockets for cooking range, chimney/ exhaust fan, refrigerator, microwave, mixer grinder & water purifier in Kitchen
  • Power sockets for washing machine & dishwasher in utility area
  • Three phase supply for each unit with an individual dual-source energy metre
  • Miniature Circuit Breakers (MCB) for each distribution board of Finolex/Havells/Polycab/Anchor

 

EV Charging

  • Provision for electric cars shall be provided for each villa

 

Servant Quarters

  • Common for 2BHK & 3BHK Forest Homes near Admin building

 

Waterproofing

  • Waterproofing for toilets, sit outs, open terrace & terrace by reputed make

 

Billing System

  • Prepaid billing system for electricity, water & maintenance

 

Security System

  • Sophisticated round-the-clock security system

 

Water Supply

  • Centralized water distribution by hydro pneumatic system for all villas with individual water metres

 

WTP & STP

  • Water Treatment Plant (WTP) for bore well water supply
  • Sewage Treatment Plant (STP) of adequate capacity as per norms will be provided inside the project along with UV filtration
  • Utilisation of treated sewage water for landscaping
  • Rainwater harvesting pits are provided to recharge groundwater levels as per norms